日本中文字幕中出在线_精品高朝久久久久9999_天天爽夜夜操一区二区_国产精品影片在线免费观看

Location:Home?>?detail
Dayaoshan Tunnel
Source:International Business Division Date:2018年11月27日

With a total length of 14 kilometers, Dayaoshan Tunnel of Hengyang-Guangzhou Railway, started in 1981 and completed in 1989, at which time it was the longest electrified double-track railway tunnel in China. CREC independently built the entire tunnel and applied the New Austrian Tunneling Method for the first time to build long mountain railway tunnel and won the National Science and Technology Advancement Award.

Daoyaoshan Tunnel

 

Print Close